Crown Court II – August 2020

Crown Court II – August 2020

Crown Court II – August 2020 City: New Haven Materials:   Firestone EPDM for the high roof and Firestone TPO for the low roof.  TPO was used as a rooftop amenity as development of a rooftop patio is in progress. Area: Roughly 12,000 Square feet...
Connecticut Juvenile Training School New Roof

Connecticut Juvenile Training School New Roof

Each building's roof system consisted of approximately 20,000 square feet of mechanically attached Sarnafil PVC membrane and 10,000 square feet of Imetco Snap Lok panels in Patina Green. The project was completed on an accelerated schedule to meet the State of...
Jewish Senior Services

Jewish Senior Services

This is a new construction for an Assisted living facility in Bridgeport for Jewish Senior Services. These are what we call a “green” roof area. What you see as roofing material is a Hot Rubberized roof coating with a protective layer on top. The rolled...
Zahren Residence

Zahren Residence

Roof Design Project subcontracted through Gables Construction – Enterprise Builders Locality: Avon, CT Project Type: Roof Design...
WCW Inc.

WCW Inc.

Nestled in between the mountains of Southern Vermont; this manufacturing facility was affected by years of heavy snow accumulation and resulting leaks. Eagle was contracted to remove the original ballasted roof system and replace it with white TPO system much more...